A tub-to-shower conversion in the Portland, OR and Vancouver, WA area typically costs $11,500–$22,000 and takes 3–7 working days. We remove the tub, update the drain and valve, waterproof the walls, and install a low-threshold or curbless shower with tile or solid-surface walls and glass.
Updated November 2026 · Reviewed by the Dapper Duck Bath project team
What's included
- Tub removal and haul-away
- Drain relocation and new pressure-balanced or thermostatic valve
- Low-threshold, curbless or ADA-style shower pan
- Full waterproofing system behind tile or solid-surface walls
- Built-in niche, bench and grab-bar blocking
- Frameless or semi-frameless glass door or panel
How much does it cost?
| Project | Scope | Typical cost | Time |
|---|---|---|---|
| Solid-surface walls | Low-maintenance, grout-free panels | $11,500–$15,500 | 3–4 days |
| Custom tile shower | Tile walls, niche, glass door | $15,000–$22,000 | 5–7 days |
| Curbless / barrier-free | Zero-entry with linear drain | $18,000–$26,000 | 6–8 days |
These are typical Portland–Vancouver metro ranges, not quotes. After a free consultation you'll receive a written fixed-price quote — the price you sign is the price you pay. Ask about financing and current offers.
Why choose Dapper Duck Bath?
- Bathroom specialists. Bathrooms are all we do.
- No surprises. Fixed-price quotes and a written schedule.
- Built to last. Full waterproofing systems and licensed plumbing & electrical.
- Backed in writing. 3-year workmanship warranty.
Serving the Portland–Vancouver metro
We provide tub-to-shower conversions in Portland, Vancouver, Camas, Washougal, Milwaukie, Clackamas, Lake Oswego, West Linn, Oregon City, Happy Valley, Gresham, Beaverton, Hillsboro, Tigard, Tualatin, Wilsonville.

